2016 Bond Update

To date we have the following folks under contract and working on the bond program.
ESC13 - Project Partner
Goodwin Lasiter Strong - Surveyor
Singleton-Zimmer-Haliburton - Architects
E3 - Old Gym HVAC
TASB - Asbestos Sampling
KLC - Technology/Security Cameras
Gessner - Geotechnical Services
BEFCO - Civil Engineering
Gaeke - Classroom CMR
Paragon - New Track
 
We have begun the classroom renovations and are striving to complete them all this summer, which include the following projects:
Replacement of ceiling grids/and tiles
Painting of classrooms
New whiteboards
New flooring
New wall covering
LED lighting upgrades
Technology upgrades
Security camera installed
Fire alarm updated
 
We are in the process of completing the schematic design phase of the new gym. Schematic design features include:
Double current capacity
4 locker rooms
Coaches' office
A service drive in the back of the gym
Slightly recessed competition floor no more than 30”
Glass wall/windows as a divider between the foyer and gym for accessible viewing
Adjustable side goals for younger students
Fixed seating
Interested in seat backs
600 or less capacity
Exterior similar to surrounding buildings
Foyer (Commons area) for eating 
Concession stand should have a view to the court
Lockable space in the concession or an addition area for vendor distribution
Concept of a drop-off drive area in front of gym (if possible)
Idea of track-specific concession at the back of the New Gym